After entering all the essential project data switch to step 5 to view a clear summary.
After verifying that the project fulfills the energy requirements you may proceed to step 6 to print it.
The entire certificate comprises at least six tables – step 2 is depicted in two tables for space reasons.
If the room book contains a large number of rooms, the overall certificate will automatically contain more than six pages.
The tables can be printed on any desired printer or saved as a pdf file.
For the certificate to be valid, it must be signed on the first page.
With a signature, the planner confirms that the details they have provided are correct to the best of their knowledge.
In the case of Minergie projects, the planner accepts the MINERGIE® licence conditions (see www.minergie.ch).